PFV Solcan Knot
Electrical studies of the photovoltaic plants El Escobar I and II (3.38 MWp each), Gran Canaria I and II (5.97 MWp each), Gran Canaria III (5.18 MWp), Salinetas (4.16 MWp), Telde I, II, III, IV and V (3.56, 1.89, 2.78, 2.08 and 1.78 MWp) and the Agüimes wind farm (10.75 MWp), among which the following stand out:
- Short-circuit studies
- Protection settings and coordination study
- Network code (NTS) and harmonics compliance
- Thermal calculation of medium voltage trenches
Date:
2024