Battery Energy Storage System “BESS SANCHOLL”
Izharia is responsible for carrying out the Technical Administrative Project (PTAD) of the Battery Energy Storage System "BESS SANCHOLL 1" with the aim of contributing to the flexibility of the grid, storing energy at times of high production and feeding it into the grid at times of high demand, promoting the integration of renewable energies and giving greater flexibility to the system.
This BESS has the following main characteristics:
22.36MWh - 450V/20kV - 5MW
We are involved in the drafting of the PTAD, covering the most critical parts of the project for obtaining permits and the correct development of the work.
We have been involved in the drafting of the following parts of the project:
Background and Purpose of the project
Regulations (State and Autonomous Community)
Conditions
Civil works (land suitability, accesses, trenches, foundations)
LV/MV calculations
Calculation of earth network
Plans (Location/Site, Implementation, Electrical, Civil, Control...)
Budget
Offprints
RBDA
Waste Management
Magnetic Fields
Health and Safety Study
This BESS has the following main characteristics:
22.36MWh - 450V/20kV - 5MW
We are involved in the drafting of the PTAD, covering the most critical parts of the project for obtaining permits and the correct development of the work.
We have been involved in the drafting of the following parts of the project:
Background and Purpose of the project
Regulations (State and Autonomous Community)
Conditions
Civil works (land suitability, accesses, trenches, foundations)
LV/MV calculations
Calculation of earth network
Plans (Location/Site, Implementation, Electrical, Civil, Control...)
Budget
Offprints
RBDA
Waste Management
Magnetic Fields
Health and Safety Study
Date:
2024