Repowering and hybridisation of the Muel wind farm
Izharia is responsible for the Technical Administrative Project for the repowering of the Muel Wind Farm, the hybridisation with the new Muel Photovoltaic Solar Plant and the new Storage system, the new Muel Substation and the modification of the route of the existing evacuation line SET Muel - SET Los Vientos, with the following main characteristics:
16.2 MW - 132/30 kV
We are involved in optimising all the resources involved, obtaining the maximum production and profitability of the project, ensuring the best environmental, landscape and social integration of the project throughout its useful life.
We have been fully involved in all phases of the project:
PE Engineering
PV Engineering
Storage Engineering
SET Engineering
LAAT Engineering
Technical Support
16.2 MW - 132/30 kV
We are involved in optimising all the resources involved, obtaining the maximum production and profitability of the project, ensuring the best environmental, landscape and social integration of the project throughout its useful life.
We have been fully involved in all phases of the project:
PE Engineering
PV Engineering
Storage Engineering
SET Engineering
LAAT Engineering
Technical Support
Date:
2024