Construction project engineering for the Iniesta Wind Farm located in the municipality of Castillejo de Iniesta, consisting of 8 wind turbines with a nominal power of 5.55 MW and 1 wind turbine of 5.60 MW from the manufacturer Nordex, model N163/5.X with the total power of the installation of 50 MW with its internal and external roads, platforms, measurement tower, drainage, medium voltage network and storage areas. Revision of the foundation design.

Date:
LOCATION:
Castillejo de Iniesta province of Cuenca, Autonomous Community of Castile-La Mancha, Spain
END DATE:
Completion Engineering 2023
INDUSTRY:
Energy
PROJECT DESCRIPTION:
Engineering of the construction project of the 50 MW Iniesta wind farm for the client Leyco SA.