Punta de Talca Wind Farm

Construction engineering of the wind farm, which is made up of a total of 14 NORDEX N155 wind turbines with a unitary power of 5.9 MW, resulting in a total power of 82.6 MW. Engineering and design of internal and external roads, platforms, measuring tower, drainage, medium voltage network and storage areas.

Date:
LOCATION:
Limarí, province of Coquimbo (Chile)
END DATE:
Completion Engineering 2022
INDUSTRY:
Energy
PROJECT DESCRIPTION:
Engineering of the wind farm Punta de Talca with a total capacity of 82.6 MW for the client EDP Renewables.
Tags: