PE Merengue II
The "Merengue II" wind farm consists of 11 wind turbines of 4.5 MW and 155 m in diameter, with a total installed capacity of 49.5 MW. The electricity generated will be injected into the "Plasencia" SET, owned by Red Eléctrica de España, SAU, via a 220 kV, 12,972 m long, underground overhead line.
Date:
2024