PVF Castle I and Castle II
PVF Castillo 1 49.5 MWp and 37.19 MWac photovoltaic plant and "PFV Castillo 2" of 49.5 MWp and 37.19 MWac and more than 200,000 modules at the interconnection point, in the municipalities of Castelnou and Escatrón, in the provinces of Teruel and Zaragoza, respectively. It should be noted that the plant will be interconnected via a joint connection infrastructure for the photovoltaic projects at the Escatrón node. This connection infrastructure, called "Subestación Eléctrica Promotores Escatrón" will have a 126 MVA transformer for the 220 kV elevation level.
Date:
2024