The line in question is intended to transport the electricity produced by the FV Balsicas plant. It runs from the ST FV Balsicas (Sabic) 30/132 kV to the ST Colectora Promotores Nudo Balsicas 132/220 kV in the municipalities of Cartagena and Torre Pacheco, in the province of Murcia.

The route contains 19 vertices and 17 alignments, with a total length of 12,667 metres.

The line consists of a single circuit in simplex configuration, with LARL-280 conductor, and an OPGW 48FO fibre optic cable will be laid using the dome of the supports. A total of 49 pylons will be installed to form the power line connecting the two substations.