Buniel 132/30 kV substation
Detailed construction engineering of the Buniel 132/30kV substation is designed to evacuate energy generated by renewable sources, interconnecting the La Torca and La Muela-Santiuste substations.
The construction project for the Buniel electricity substation is of the 132 kV outdoor type with 30 kV cubicles, single busbar configuration. The outdoor substation consists of three lines and a 132/30 kV transformer position.
- Detailed earthworks engineering
- Detailed engineering of civil works and metallic structures
- Electromechanical assembly detail engineering
- Engineering detail protection, control and measurement
- Detailed engineering of ancillary services
The Buniel 132/30kV substation represents a significant step forward in the transition to a more sustainable and efficient electricity system. Its strategic location allows for the seamless integration of renewable energy into the grid, thus contributing to the reduction of carbon emissions and the promotion of clean energy.
Date:
2024