La Torca Substation 400/132 kV
Detailed construction engineering of the La Torca 400/132kV substation is designed to evacuate the energy generated by renewable sources from the Atalayas, Valdemoro, Isar-Yudego, Moral, Muela-Santiueste, Tortoles and Buniel wind farms.
The construction project for the La Torca substation is a 400 kV and 132 kV outdoor substation with a single busbar configuration. The 400 kV substation has a 400/132 kV autotransformer and the 132 kV substation has four line positions and one 132 kV autotransformer.
- Detailed earthworks engineering
- Detailed engineering of civil works and metallic structures
- Electromechanical assembly detail engineering
- Engineering detail protection, control and measurement
- Detailed engineering of ancillary services
Date:
2024