La Torca Substation 400/132 kV

Detailed construction engineering of the La Torca 400/132kV substation is designed to evacuate the energy generated by renewable sources from the Atalayas, Valdemoro, Isar-Yudego, Moral, Muela-Santiueste, Tortoles and Buniel wind farms. 

The construction project for the La Torca substation is a 400 kV and 132 kV outdoor substation with a single busbar configuration. The 400 kV substation has a 400/132 kV autotransformer and the 132 kV substation has four line positions and one 132 kV autotransformer.

  • Detailed earthworks engineering
  • Detailed engineering of civil works and metallic structures
  • Electromechanical assembly detail engineering
  • Engineering detail protection, control and measurement
  • Detailed engineering of ancillary services
Date:
LOCATION:
Buniel (Burgos) (Castile-León)
END DATE:
2022
INDUSTRY:
Energy
PROJECT DESCRIPTION:
Detailed construction engineering La TORCA 400/132 kV substation