Muniesa 400/220 kV substation

Detailed construction engineering for the Muniesa 400/220 kV substation, which evacuates energy from the Muniesa, Farlán, San Pedro de Alacón, Allueva, Sierra Pelarda, Sierra de Oriche, Pedregales, Piedrahita, El Castillo, Cañaseca, Los Gigantes, Tico, Las Majas VII, Hilada Honda, Segura II, Segura I, Monforte I, Monforte II, La Rocha I and La Rocha II wind farms. The substation will be prepared to house three autotransformers with a total rated power of 1,150 MVA.

The construction project for the Muniesa electricity substation is an open-air, single busbar configuration. The 400 kV substation is made up of one line position and three autotransformer positions and the 220 kV substation is made up of three auto positions (low side) and 6 line positions from different promoters. 

  • Elaboration of technical specifications for switchgear
  • Technical support for switchgear purchase
  • Detailed earthworks engineering
  • Detailed engineering of civil works and metallic structures
  • Electromechanical assembly detail engineering
  • Engineering detail protection, control and measurement
  • Basic telecommunications engineering
  • Detailed engineering of ancillary services
  • Site support in the construction phase
Date:
LOCATION:
Muniesa (Teruel) (Aragón)
END DATE:
2021
INDUSTRY:
Energy
PROJECT DESCRIPTION:
Detailed construction engineering Muniesa 400/220 kV Substation