Loma Gorda Substation 220/20 kV

Detailed engineering and construction of the Loma Gorda 220/20 kV substation that evacuates energy from the Loma Gorda wind farms. 

The construction project for the Loma Gorda substation is a 220 kV outdoor substation with 20 kV cubicles, single busbar configuration. The outdoor substation consists of a line and a 220/20 kV transformer position.

  • Elaboration of technical specifications for switchgear
  • Technical support for switchgear purchase
  • Detailed earthworks engineering
  • Detailed engineering of civil works and metallic structures
  • Electromechanical assembly detail engineering
  • Engineering detail protection, control and measurement
  • Basic telecommunications engineering
  • Detailed engineering of ancillary services
  • Site support in the construction phase
Date:
LOCATION:
Fuendetodos (Zaragoza) (Aragón)
END DATE:
2020
INDUSTRY:
Energy
PROJECT DESCRIPTION:
Construction detail engineering LOMA GORDA 220/20 kV Substation