Merengue II Substation 220/30 kV
Detailed construction engineering of the Merengue II 220/30V substation that evacuates the energy coming from the hybridisation of the 50 MW Merengue wind farm and the 25 MW photovoltaic plant.
The construction project for the Merengue II electrical substation is of the 220 kV outdoor type with 30 kV cubicles, single busbar configuration. The outdoor substation consists of a line and two 220/30 kV transformer positions.
- Detailed earthworks engineering
- Detailed engineering of civil works and metallic structures
- Electromechanical assembly detail engineering
- Engineering detail protection, control and measurement
- Detailed engineering of ancillary services